4S Ranch Wastewater
Treatment Plant

Bulverde, TX

Pape-Dawson provided civil engineering and design services for a 0.48 MGD wastewater treatment plant for the 4S Ranch development in Bulverde. We developed, permitted, and constructed all aspects of this project and accounted for future expansions to full-permitted flow.

The project scope included development of an influent lift station, headworks with bar screening, and a package treatment plant with aeration and digester basins, clarifier, chlorine contact chamber, and tertiary filtration. We also designed an effluent lift station, blowers, non-potable water system, operations building, chlorine and aluminum feed system, and sludge dewatering area.

We designed the plant per Texas Commission on Environmental Quality (TCEQ) and Guadalupe-Blanco River Authority (GBRA) standards and mitigated resident concerns by paying close attention to odor control and aesthetics.

Project Type

Water & Wastewater

Project Sub-Type

Wastewater
Treatment Design

PhoneLocationEmailClockFaxCompassCompanyExternalsearchicon YoutubeFacebookXLinkedInInstagramnotfound

You can do a form or anything else you want to put here.