IH 75 & Collier
Boulevard Utility
Relocation Design-Build

Collier County, FL

Pape-Dawson (as GradyMinor) was the engineer of record and construction administrator for this project which included installation of over 20,000 LF of water main piping, varying in size up to 36″ HDPE. The project was broken into nine segments and included both open cut and Horizontal Directional Drilling (HDD), including a 36″ HDD under IH 75 and under the SFWMD’s Henderson Creek.

The project required accelerated survey, design, and permitting to be completed ahead of Florida Department of Transportation (FDOT) improvements at IH 75 and Collier Boulevard; multiple easements; and extensive coordination with surrounding residents, businesses, and key stakeholders. Ultimately, the project was completed ahead of schedule.