Pump Station
No. 101.07 Replacement
Naples, FL
Pape-Dawson (as GradyMinor) performed the design and construction survey, in addition to the design, permitting, bidding, and construction administration for the replacement of this pump station. The pump station was located on the west side of Vanderbilt Drive between 104th Avenue North and 103rd Avenue North, adjacent to a saltwater canal in Naples Park. The pump station was difficult to access, in a location that makes wastewater spills difficult to contain, and did not meet current Collier County Utility Standards. The County acquired a site within Naples Park for the new pump station approximately 200’ east of Vanderbilt Drive.
Project Type
Project Sub-Type
Water Supply
Infrastructure Design
Related Projects