Medina River Sewer Outfall

Pape-Dawson planned, designed, and oversaw construction of this 32-mile pipeline (18″ to 96″ in diameter), designed to capture sewer flows from surrounding properties and to allow San Antonio Water System (SAWS) to decommission the Lone Star, Pearsall, Fischer Road, and Toyota Plant South lift stations.

Our design led the way for SAWS to develop a regional gravity sewer outfall solution to serve more than 200,000 future customers, giving SAWS the ability to accept future flows of up to 50 MGD from the Leon Creek Water Recycling Center.

Areas of Expertise

Surveying & Geospatial

Pape-Dawson provided surveying services, which included boundary surveys and metes and bounds descriptions for 108 easements, topographic and tree surveys for design, as well as horizontal and vertical control throughout the project that was used for construction staking.

Project Type

Water & Wastewater

Project Sub-Type

Water Distribution & Wastewater Collection