Pape-Dawson was contracted to design a 142-mile water pipeline traversing through two state plane coordinate zones and seven counties, from Burleson County to north Bexar County. Our survey team established the horizontal and vertical control points by GPS methods, and used them as the basis for the subsequent aerial mapping, boundary surveys, and construction staking for the entire project. We conducted individual boundary surveys of the easement tracts and prepared survey drawings and metes and bounds descriptions for each.