Pape-Dawson provided sewer improvements needed for Saddlecreek’s off-site sewer main in Georgetown, including 7,200 LF of gravity sewer main, a 5 MGD lift station (with a 2 MGD interim phase), and 1,400 LF of a dual (10” and 12”) force main connecting to the existing Dove Springs wastewater treatment plant. Our services included overseeing PS&E, flow capacity calculations, hydraulic pump calculations, force main sizing, project coordination, and construction oversight.