Pape-Dawson planned, designed, and oversaw construction of this 32-mile pipeline (18″ to 96″ in diameter), designed to capture sewer flows from surrounding properties and to allow San Antonio Water System to decommission the Lone Star, Pearsall, Fischer Road, and Toyota Plant South lift stations.
Our design led the way for the SAWS to develop a regional gravity sewer outfall solution to serve more than 200,000 future SAWS customers, giving SAWS the ability to accept future flows of up to 50 MGD from the Leon Creek Water Recycling Center.