Pape-Dawson was responsible for the design of a 375,000-gallon ground storage tank, pump system, and 8″ and 24″ water lines. We acquired the necessary permits for TxDOT driveway access and the crossing of a Tarrant Regional Water District transmission water main, conducted boundary and topographic surveying, performed an environmental investigation for waters of the U.S. determination, and provided bidding and construction phase services.